Hull welded up and ready for turn over
The hull is now fully welded. We are ready to turn her over in the next week. These photos show the spigots we have welded to each end of the hull along with doubling plates to spread the load. We will use two 15 tonne cranes to lift it and then use the overhead crane in the workshop to control the roll.